GULF Gulfster
On
Upham's Joint Permit From The Governor's Office
|
Well the groins are approved. November
2004 is the projected date of construction. What is a groin? A groin is
a man made structure that extends from the shoreline out into the water
to collect sediment. Longshore drift and current moves parallel to the
shore, while the groins are perpendicular to the shore. The waves hit
the beach at an angle. As a result of all of this, there is sediment deposited
on one side of the groin, while sediment is eroded on the other side.
Initially, one might jump at the idea of groins, but groins are not without
their problems.If Upham gets 5 groins, they will indeed need more to stop
the erosion elsewhere down the beach. In Upham's case they will be constructed
out of sandbags. This way if the outcome is not what was expected, they
can be removed.What will this do to the Infamous "point break"
known as Upham? I don't think anyone clearly knows! Hopefully something
good. The break upham has been on a trend of getting worse every year.
I think it is about time for a change. The point it is at now, seems like
anything will be better. |
But
with the erosion being the county's main concern. Even if the groins are
beneficial for the surf, if the southern beaches start to erode at a faster
rate then they will be removed. That will suck to get a taste of Upham's
potential and then have it taken from us. But on the other hand the break
could be ruined and the erosion be cured and then the groins wont be going
anywhere.It is a gamble and only time will tell. In everyone's best interest, we hope that the groins fulfill there purpose and stop the erosion problem and make the surf the best Upham has ever seen. |
|
|